03-29-2016, 03:50 PM
Saw this last week. Huge Crane/concrete pouring type thing at the Azul place.
Also saw the construction at the Royalton. Maybe 8, 9, or 10 buildings. At least a few are already 4 floors, and based on my guess of rebar use, will go to 5 floors (meaning the rebar was sticking another story above the existing 4th floor - maybe they bend it over? I doubt it). Also looked like they took not just part of the property at Rutland Point, but ALL of it - construction goes right next to the Negril Village (whatever it is called now).
There were 1,000 construction workers there. Seriously.
Also saw the construction at the Royalton. Maybe 8, 9, or 10 buildings. At least a few are already 4 floors, and based on my guess of rebar use, will go to 5 floors (meaning the rebar was sticking another story above the existing 4th floor - maybe they bend it over? I doubt it). Also looked like they took not just part of the property at Rutland Point, but ALL of it - construction goes right next to the Negril Village (whatever it is called now).
There were 1,000 construction workers there. Seriously.